Chlorine Transfer Hose

Chlorine Transfer Hose Assemblies

Hose assemblies for liquid and dry chlorine service, quoted to the standard your site specifies and supplied with test documentation.

  • Liquid & Dry Chlorine Service
  • Monel & Alloy End Fittings
  • Documented Hydrostatic Testing

Quote a Chlorine Hose Assembly

Tell us the service, size, ends and the standard you build to. Our team replies with pricing and lead time in 1-2 business hours.

No obligation. We never share your details. Send your spec or drawing by replying to our quote email.

Chlorine Transfer Hose

Chlorine is one of the least forgiving media in industrial service. Specialties Company supplies chlorine transfer hose assemblies for liquid and dry chlorine, quoted to the standard your site specifies and supplied with the documentation your safety group requires.

Quoted to Your Governing Standard

Chlorine hose is not a catalog commodity — the correct construction depends on your service conditions and the standard your facility works to. Many operators specify to Chlorine Institute Pamphlet 6. Tell us which standard governs your application and we will quote a build that meets it, including the required testing and certification package. If you are unsure, our team will work from your service conditions and confirm the spec before anything is fabricated.

Constructions Available

  • Liquid chlorine hose for tank car, tank truck and cylinder transfer
  • Dry chlorine gas service lines
  • PTFE-lined constructions with stainless braid
  • Corrugated metal hose in Monel and other corrosion-resistant alloys
  • Monel and Hastelloy end fittings and flanges
  • Sodium hypochlorite and bleach transfer hose for water treatment

Material Compatibility Matters

Dry chlorine and wet chlorine behave very differently against the same metal. Trace moisture turns chlorine aggressively corrosive to alloys that handle the dry gas without issue, which is why Monel shows up so often in chlorine service fittings and metal hose. Give us your actual moisture content, temperature and pressure and we will spec the wetted materials against them rather than against a generic chart.

Testing and Documentation

Assemblies are hydrostatically tested and tagged before shipment. Material test reports, test certificates and traceability documentation are available on request — tell us what your QA group needs and we will include it in the quote.

Service Life and Replacement

Chlorine transfer hose is a scheduled-replacement item at most facilities, not a run-to-failure one. Follow your site's inspection and retirement interval and your chlorine supplier's guidance. We can quote standing replacement sets so the assemblies are on the shelf before the interval comes due.

Request a Quote

Use the form above with your service, size, length, end connections and governing standard — or call (979) 233-6223. Our team replies with pricing, lead time and the documentation package, usually within 1–2 business hours.

Since 1967

Trusted by the Gulf Coast's Leading Operators

Chemical Manufacturers
Water & Wastewater Utilities
Refineries & Petrochemical Plants
EPC & Industrial Contractors
Marine & Dock Operators

Ariba-enabled · SAM.gov CAGE 8GK08 · Woman-owned small business